General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this power unit is created to the operation of two independent circuits. Which are respectively for your most important and subordinate platforms of your double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in situation of electrical power reduction. If additional independent circuits are needed to your application please make contact with us for availability.
Remark: one. Please talk to our income engineer for that various pump displacement, motor electrical power or tank capacity.
2. CSA or UL certified motors can be found upon request.
Special Notes
one. The AC motor is of S3 duty cycle, which can only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean the many hydraulic parts concerned just before set up of the energy unit.
three. Viscosity of your oil shoud be 15~46 cst,along with the oil should really be clean and cost-free of impurities,N46 hydraulic oil is encouraged.
4. The electrical power unit should really be mounted vertically.
five. Check the oil level in the tank soon after the original operating on the energy unit.
six. Oil shifting is required right after the preliminary a hundred operation hrs,afterwards after each 3000 hrs.